Sign inSubmit
Tips: “quotes” for a phrase · author:Lee · a DOI goes straight to its article

26 results for “steady state analysis”

Set a search alert
Research ArticleOpen accessIn the keywordsCost Analysis of Two-Dissimilar-Unit Cold Standby System with three States and Preventive Maintenance Using Linear First Order Differential EquationsM. Y. HaggagProblem statement: Several researchers have studied the reliability behavior of a three state systems, but no attention was paid to the reliability evaluation due to preventive maintenance. The better maintenance of the system originates better reliability. Also, standby support increases the reliability of the system. Approach: Determine the efficacy of preventive maintenance on the reliability and performance of the system. … …Journal of Mathematics and Statistics, Vol. 5, Issue 4 · 31 Dec 2009 · 6,873 accessesView PDFCite
Research ArticleOpen accessIn the keywordsCost Analysis of a System Involving Common-Cause Failures and Preventive MaintenanceM.Y. HaggagProblem statement: Many authors have studied the cost analysis of a two-unit cold standby redundant system with two types of unit failure, but no attention was paid to the reliability of a system involving common-cause failures and preventive maintenance. Question was raised whether the preventive maintenance would be effective on the reliability and performance of the system. Determine the efficacy … …Journal of Mathematics and Statistics, Vol. 5, Issue 4 · 31 Dec 2009 · 7,606 accessesView PDFCite
Research ArticleOpen accessIn the keywordsCost Analysis of K-Out of-n Repairable System with Dependent Failure and Stand by Support Using Kolmogorov's Forward Equations MethodM. Y. HaggagProblem statement: Many authors have studied k-out of-n repairable system with dependent failure and standby support. The question was raised whether the repair and standby units support increase the reliability of the system. Determine the efficiency of repair and standby support on the reliability of the system. Approach: In this study the statistical analysis of k-out of-n repairable system with … …Journal of Mathematics and Statistics, Vol. 5, Issue 4 · 31 Dec 2009 · 6,598 accessesView PDFCite
Research ArticleOpen accessIn the keywordsCost Analysis of A System with Preventive Maintenance by Using the Kolmogorov’s Forward Equations MethodKhaled Moh. El-SaidThis study deals with cost analysis of a two- unit cold standby redundant system with preventive maintenance.The random failure occurs at random times which follow an exponential distribution and also the repair time are assumed to be exponentially distributed. Using the Kolmogorov’s forward equations method. Several reliability characteristics are obtained. The mean time to system failure (MTSF) and the profit … …American Journal of Applied Sciences, Vol. 5, Issue 4 · 30 Apr 2008 · 7,063 accessesView PDFCite
Research ArticleOpen accessIn the keywordsComputational Discrete Time Markov Chain with Correlated Transition ProbabilitiesPeerayuth CharnsethikulThis study presents a computational procedure for analyzing statistics of steady state probabilities in a discrete time Markov chain with correlations among their transition probabilities. The proposed model simply uses the first order Taylor’s series expansion and statistical expected value properties to obtain the resulting linear matrix equations system. Computationally, the bottleneck is O(n4) but can be improved by distributed … …Journal of Mathematics and Statistics, Vol. 2, Issue 4 · 31 Dec 2007 · 6,648 accessesView PDFCite
Research ArticleOpen accessIn the abstractEvaluation of Gaussian Plume Model against CFD Simulations through the Estimation of CO and NO Concentrations in an Urban AreaMahmoud BadyDispersion of air pollutants, Carbon monoxide (CO) and Nitrogen oxide (NO), due to three point sources and a high-density traffic road in an urban area located near the center of Tokyo, Japan was studied using two different approaches. The first is an analytical approach using Gaussian Plume Model (GPM) while the second is a numerical approach using Computational Fluid Dynamics … …American Journal of Environmental Sciences, Vol. 13, Issue 2 · 12 Apr 2017 · 7,907 accessesView PDFCite
Research ArticleOpen accessIn the abstractEfficiency Estimation of Innovative Activity the EnterprisesAndrey Sergeevich Nechaev, Dmitry Alekseevich Antipin, Oksana Victorovna AntipinaThe widely acknowledged fact is that the economic growth based only on an export of the raw materials cannot be stable for a long time and thereupon the financial support of an innovative activity gets of a special urgency. To provide higher and steady rates of an economy growth it is necessary to carry out a transition to an innovative … …Journal of Mathematics and Statistics, Vol. 10, Issue 4 · 5 Jan 2015 · 7,632 accessesView PDFCite
Research ArticleOpen accessIn the abstractCOMPARISON OF OPTIMIZATION TECHNIQUE TO FIND THE OPTIMAL LOCATION OF FACTS CONTROLLERS FOR TRANSMISSION LINEJagadeesh Kumar Muthukrishnan, Subhransu Sekhar Dash, Harish Kiran Selvakumar et al.The aspect of this study is to compare the three different algorithms such as Genetic Algorithm (GA), Enhanced Genetic Algorithm (EGA) and Particle Swarm Optimization (PSO) to fine the optimal location of the FACTS device in the transmission line. The FACTS devices Thyristor Controlled Series Compensator (TCSC) and Unified Power Flow Controller (UPFC) are selected based on the steady stability … …American Journal of Applied Sciences, Vol. 11, Issue 2 · 26 Dec 2013 · 6,677 accessesView PDFCite
Research ArticleOpen accessIn the abstractA Novel Interconnect Structure for Elmore Delay Model with Resistance-Capacitance-Conductance SchemeUma Ramadass, Krishnappriya, Jebashini Ponnian, P. DhavachelvanIn this brief, we present a simple close-form delay estimate, based on first and second order moments that handle arbitrary voltages and conductance effects for a lumped and distributed line. This proposed model introduces a simple tractable delay formula by incorporating conductance (G) into Resistance, Capacitance (RC) network by preserving the characteristics of the Elmore delay model. The RCG model … …American Journal of Applied Sciences, Vol. 10, Issue 8 · 24 Jul 2013 · 7,045 accessesView PDFCite
Research ArticleOpen accessIn the abstractMethodical Tuning of Proportional Plus Integral Controllers for Cascade Control of Separately Excited DC MotorsIbrahim Al-AbbasThe cascade control of DC motors by PI controllers was extensively used in industry. Approximation rules based on plotting the output of the system or on computer simulation were used to determine the parameters of these controllers. This study was done to develop mathematical expressions to calculate the parameters of these controllers. Output time functions of the system and there … …American Journal of Applied Sciences, Vol. 9, Issue 11 · 12 Sep 2012 · 7,008 accessesView PDFCite