MODEL BUILDING FOR AUTOCORRELATED PROCESS CONTROL: AN INDUSTRIAL EXPERIENCE
M. A. Djauhari1, S. L. Lee1 & Z. Ismail1 Show affiliations
- Department of Mathematical Sciences, Faculty of Science, Universiti Teknologi Malaysia, Johor, Malaysia
American Journal of Applied Sciences, Volume 11, Issue 6, pp. 888–898 · doi.org/10.3844/ajassp.2014.888.898
Abstract
We show that many time series data are governed by Geometric Brownian Motion (GBM) law. This motivates us to propose a procedure of time series model building for autocorrelated process control that might consist of two steps. First, we test whether the process data are governed by GBM law. If it is affirmative, the appropriate model is directly given by the properties of that law. Otherwise, we go to the standard practice at the second step where the best model is constructed by using ARIMA method. An industrial example will be reported to demonstrate the advantages of that procedure. In that example, a comparison study with ARIMA method will be reported to illustrate the effectiveness and efficiency of the GBM-based model building.
Licence and reuse
Open access. This article is licensed under a Creative Commons Attribution 3.0 Licence (CC BY 3.0), as printed on the article, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original authors and the source. No permission is needed.
How to reuse this articleResponses (0)
About this article
Djauhari, M. A., Lee, S. L. & Ismail, Z. (2014). MODEL BUILDING FOR AUTOCORRELATED PROCESS CONTROL: AN INDUSTRIAL EXPERIENCE. American Journal of Applied Sciences, 11(6), 888–898. https://doi.org/10.3844/ajassp.2014.888.898
- Licence
- CC BY 3.0
- Issue
- Volume 11, Issue 6
- Policies
- Editorial independenceUse of generative AIData availabilityAppeals and complaints
- Version
- Version of record