Sign inSubmit
ArticleMetrics
Research Article · Free to read · Published 30 November 2007

Three Algorithms for Flexible Flow-shop Scheduling

Tzung-Pei Hong, Pei-Ying Huang, Gwoboa Horng & Chan-Lon Wang

American Journal of Applied Sciences, Volume 4, Issue 11, pp. 887–895 · doi.org/10.3844/ajassp.2007.887.895

6,969 accesses7,952 downloads1 citations (Crossref)Metrics
Cite Check for updates

Abstract

Scheduling is an important process widely used in manufacturing, production, management, computer science, and so on. Appropriate scheduling can reduce material handling costs and time. Finding good schedules for given sets of jobs can thus help factory supervisors effectively control job flows and provide solutions for job sequencing. In simple flow shop problems, each machine operation center includes just one machine. If at least one machine center includes more than one machine, the scheduling problem becomes a flexible flow-shop problem. Flexible flow shops are thus generalization of simple flow shops. In this paper, we propose three algorithms to solve flexible flow-shop problems of more than two machine centers. The first one extends Sriskandarajah and Seth's method by combining both the LPT and the search-and-prune approaches to get a nearly optimal makespan. It is suitable for a medium-sized number of jobs. The second one is an optimal algorithm, entirely using the search-and-prune technique. It can work only when the job number is small. The third one is similar to the first one, except that it uses Petrov's approach (PT) to deal with job sequencing instead of searchand- prune. It can get a polynomial time complexity, thus being more suitable for real applications than the other two. Experiments are also made to compare the three proposed algorithms. A trade-off can thus be achieved between accuracy and time complexity.

Licence and reuse

Free to read. This article carries the publisher’s copyright, as printed on it: © 2007 Science Publications. It is free to read; ask us before reusing it.

How to reuse this article

Responses (0)

Have a comment on this research? Sign in to respond. Responses are moderated and published with your name and affiliation; the authors are invited to reply. How we use your dataWrite a response

About this article

Cite this article

Hong, T., Huang, P., Horng, G. & Wang, C. (2007). Three Algorithms for Flexible Flow-shop Scheduling. American Journal of Applied Sciences, 4(11), 887–895. https://doi.org/10.3844/ajassp.2007.887.895

Licence
© Science Publications
Issue
Volume 4, Issue 11
Policies
Editorial independenceUse of generative AIData availabilityAppeals and complaints
Version
Version of record
Three Algorithms for Flexible Flow-shop SchedulingAmerican Journal of Applied Sciences · Volume 4, Issue 11 · pp. 887–895 · © Science PublicationsDownload