Development of Priority Oriented Scheduling Method to Increase the Reliability of Manufacturing Systems

Seyedehfarzaneh Nojabaei1, Z. Leman1, S. H. Tang1 & S. Sulaiman1

American Journal of Applied Sciences, Volume 9, Issue 9, pp. 1435–1442 · doi.org/10.3844/ajassp.2012.1435.1442

7,015 accesses4,664 downloads0 citations (Crossref)Journal metrics
Cite Check for updates

Abstract

Scheduling occurs in every organization without considering the nature of its activities. In this regard, numerous scholars have attempted to schedule via divergent methods including classical scheduling, genetic algorithm, neural network and fuzzy logic and so on. Studies in manufacturing scheduling mostly deal with priority rules without any consideration of the system states. An appropriate scheduling leads to significant enhancement of fairness in job scheduling. The term fairness can be transformed into a specific selection of job weights. There is no method of scheduling in which priority, time action (duration) and time stamp of jobs have simultaneously been considered. But the proposed method of scheduling can enhance the efficiency and reliability of manufacturing systems. To fulfill this target, first and foremost, the normalize method should be performed. This method allows data (time stamp, time action, priority) of jobs on different scales to be compared by bringing them to a common scale. Secondly, the jobs should be arranged based on three criteria which are priority, time action and time stamp. This sorting algorithm is programmed via MATLAB Distributed Computing Server (DCS) software. Eventually, to evaluate the proposed method of scheduling, simulation is operated. The simulated algorithm shows that applying the proposed method of scheduling increases the efficiency of simulated scheduler in comparison with applying the common method of scheduling. Besides the mentioned simulated algorithm, there is a mathematical proof to show the enhancement of reliability.

Licence and reuse

Free to read. This article carries the publisher’s copyright, as printed on it: © 2012 Science Publications. It is free to read; ask us before reusing it.

How to reuse this article

Responses (0)

Have a comment on this research? Sign in to respond. Responses are moderated and published with your name and affiliation; the authors are invited to reply. How we use your dataWrite a response

About this article

Cite this article

Nojabaei, S., Leman, Z., Tang, S. H. & Sulaiman, S. (2012). Development of Priority Oriented Scheduling Method to Increase the Reliability of Manufacturing Systems. American Journal of Applied Sciences, 9(9), 1435–1442. https://doi.org/10.3844/ajassp.2012.1435.1442

Licence
© Science Publications
Issue
Volume 9, Issue 9
Policies
Editorial independenceUse of generative AIData availabilityAppeals and complaints
Version
Version of record
Development of Priority Oriented Scheduling Method to Increase the Reliability of Manufacturing SystemsAmerican Journal of Applied Sciences · Volume 9, Issue 9 · pp. 1435–1442 · © Science PublicationsDownload