Busy Period Analysis of a Man-machine System Operating Subject To Different Physical Conditions
G S. Mokaddis, M. L. Tawfek & S. A.M. Elhssia
Journal of Mathematics and Statistics, Volume 1, Issue 2, pp. 160–164 · doi.org/10.3844/jmssp.2005.160.164
Abstract
This study deals with some characteristics of a single-unit of a man-machine system operating under different physical conditions. The failure, repair and change of physical conditions (good-poor) are stochastically independent random variables each having an arbitrary distribution. The system analysed by some Markov process technique. The busy period, expected number of visits by the repairman and the cost per unit time in a steady state of the system are obtained. Several important results have been derived as particular cases.
Licence and reuse
Free to read. This article carries the publisher’s copyright, as printed on it: © 2005 Science Publications. It is free to read; ask us before reusing it.
How to reuse this articleResponses (0)
About this article
Mokaddis, G. S., Tawfek, M. L. & Elhssia, S. A. (2005). Busy Period Analysis of a Man-machine System Operating Subject To Different Physical Conditions. Journal of Mathematics and Statistics, 1(2), 160–164. https://doi.org/10.3844/jmssp.2005.160.164
- Licence
- © Science Publications
- Issue
- Volume 1, Issue 2
- Policies
- Editorial independenceUse of generative AIData availabilityAppeals and complaints
- Version
- Version of record
