Optimization of Field Development Scheduling, East Unity Oil Field, Sudan
Tagwa A. Musa, Ahmed A.E. Ibrahin, Guan ZhenLiang & Fei Qi
American Journal of Environmental Sciences, Volume 1, Issue 1, pp. 29–33 · doi.org/10.3844/ajessp.2005.29.33
Abstract
In order to improve the reservoir performance in East Unity oil field Sudan, the studies focused on characterization, modeling and simulation of the actual performance and future development. A model was constructed using a three-phase, three dimensional, black oil simulator (ECLIPSE). In this study a data from East Unity oil field Sudan started production at July 1999 was used to perform the optimal oil rate and designing the best location of the new operating wells. Cumulative oil production, oil production rate, Water cut and recovery factor were used as key criteria to see if adding new wells in the area under study are economic risk.
Licence and reuse
Free to read. This article carries the publisher’s copyright, as printed on it: © 2005 Science Publications. It is free to read; ask us before reusing it.
How to reuse this articleResponses (0)
About this article
Musa, T. A., Ibrahin, A. A., ZhenLiang, G. & Qi, F. (2005). Optimization of Field Development Scheduling, East Unity Oil Field, Sudan. American Journal of Environmental Sciences, 1(1), 29–33. https://doi.org/10.3844/ajessp.2005.29.33
- Licence
- © Science Publications
- Issue
- Volume 1, Issue 1
- Policies
- Editorial independenceUse of generative AIData availabilityAppeals and complaints
- Version
- Version of record
