An Approach to Develop a Dynamic Job Shop Scheduling by Fuzzy Rule Based System and Comparative Study with the Traditional Priority Rules
Ramin Ahmed1, Md. Muzahid Khan1, Md. Hasibul Haque1 & Md. Hasibur Rahman1 Show affiliations
- Khulna University of Engineering and Technology, Bangladesh
American Journal of Engineering and Applied Sciences, Volume 9, Issue 2, pp. 202–212 · doi.org/10.3844/ajeassp.2016.202.212
Abstract
This paper aims at developing a dynamic job shop scheduling by establishing fuzzy rule based system and comparing its effectiveness with the traditional priority rules. In order to understand the priorities of different jobs in a job shop, the paper investigates all the contributing criteria of different parameters. Since the traditional priority rules only emphasis on a single parameter at a time, the authors propose a method of obtaining a schedule which incorporates all the desired contribution criteria of the parameters used. This method includes establishing a Fuzzy priority rule. Fuzzy is an appropriate model when uncertainty and irregularities are present. It also allows modeling of a significant number of alternatives across different parameters considered in a job shop. Hence, a dynamic job shop schedule can be developed using the established fuzzy priority rule. This research is based on an example of jobs arriving in a regular semi-automated job shop, not a fully automated or software based job shop. The practical implications of this paper is to identify the proper parameters and evaluate their contribution criteria on the required conditions so that managers can determine the proper scheduling and sequence of the jobs to be machined in the job shop. This study provides a deterministic method for local managers to assess the effects of job shop scheduling and sequence of jobs.
Licence and reuse
Open access. This article is licensed under a Creative Commons Attribution 3.0 Licence (CC BY 3.0), as printed on the article, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original authors and the source. No permission is needed.
How to reuse this articleResponses (0)
About this article
Ahmed, R., Khan, M. M., Haque, M. H. & Rahman, M. H. (2016). An Approach to Develop a Dynamic Job Shop Scheduling by Fuzzy Rule Based System and Comparative Study with the Traditional Priority Rules. American Journal of Engineering and Applied Sciences, 9(2), 202–212. https://doi.org/10.3844/ajeassp.2016.202.212
- Licence
- CC BY 3.0
- Issue
- Volume 9, Issue 2
- Policies
- Editorial independenceUse of generative AIData availabilityAppeals and complaints
- Version
- Version of record
