Sign inSubmit
ArticleMetrics
Research Article · Open access · Published 11 February 2016

An Approach to Develop a Dynamic Job Shop Scheduling by Fuzzy Rule Based System and Comparative Study with the Traditional Priority Rules

Ramin Ahmed1, Md. Muzahid Khan1, Md. Hasibul Haque1 & Md. Hasibur Rahman1

American Journal of Engineering and Applied Sciences, Volume 9, Issue 2, pp. 202–212 · doi.org/10.3844/ajeassp.2016.202.212

8,365 accesses5,646 downloads3 citations (Crossref)Metrics
Cite Check for updates

Abstract

This paper aims at developing a dynamic job shop scheduling by establishing fuzzy rule based system and comparing its effectiveness with the traditional priority rules. In order to understand the priorities of different jobs in a job shop, the paper investigates all the contributing criteria of different parameters. Since the traditional priority rules only emphasis on a single parameter at a time, the authors propose a method of obtaining a schedule which incorporates all the desired contribution criteria of the parameters used. This method includes establishing a Fuzzy priority rule. Fuzzy is an appropriate model when uncertainty and irregularities are present. It also allows modeling of a significant number of alternatives across different parameters considered in a job shop. Hence, a dynamic job shop schedule can be developed using the established fuzzy priority rule. This research is based on an example of jobs arriving in a regular semi-automated job shop, not a fully automated or software based job shop. The practical implications of this paper is to identify the proper parameters and evaluate their contribution criteria on the required conditions so that managers can determine the proper scheduling and sequence of the jobs to be machined in the job shop. This study provides a deterministic method for local managers to assess the effects of job shop scheduling and sequence of jobs.

Licence and reuse

Open access. This article is licensed under a Creative Commons Attribution 3.0 Licence (CC BY 3.0), as printed on the article, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original authors and the source. No permission is needed.

How to reuse this article

Responses (0)

Have a comment on this research? Sign in to respond. Responses are moderated and published with your name and affiliation; the authors are invited to reply. How we use your dataWrite a response

About this article

Cite this article

Ahmed, R., Khan, M. M., Haque, M. H. & Rahman, M. H. (2016). An Approach to Develop a Dynamic Job Shop Scheduling by Fuzzy Rule Based System and Comparative Study with the Traditional Priority Rules. American Journal of Engineering and Applied Sciences, 9(2), 202–212. https://doi.org/10.3844/ajeassp.2016.202.212

Licence
CC BY 3.0
Issue
Volume 9, Issue 2
Policies
Editorial independenceUse of generative AIData availabilityAppeals and complaints
Version
Version of record
An Approach to Develop a Dynamic Job Shop Scheduling by Fuzzy Rule Based System and Comparative Study with the Traditional Priority RulesAmerican Journal of Engineering and Applied Sciences · Volume 9, Issue 2 · pp. 202–212 · CC BY 3.0Download