Sign inSubmit
ArticleMetrics
Research Article · Free to read · Published 31 March 2010

Production Scheduling for Dispatching Ready Mixed Concrete Trucks Using Bee Colony Optimization

Sakchai Srichandum1 & Thammasak Rujirayanyong1

American Journal of Engineering and Applied Sciences, Volume 3, Issue 1, pp. 7–14 · doi.org/10.3844/ajeassp.2010.7.14

9,322 accesses8,011 downloads29 citations (Crossref)Metrics
Cite Check for updates

Abstract

Problem statement: This study proposed a systematic model of delivering Ready Mixed Concrete (RMC) that optimizes the schedule of dispatching RMC trucks. Approach: Firstly, the factors that impact the RMC delivery process are analyzed. Secondly, a model based on Bee Colony Optimization (BCO) was developed in order to find the best dispatching schedule that minimize the total waiting time of RMC trucks at construction sites. Results: To demonstrate its efficiency, the BCO algorithm was applied to solve two dispatching RMC problems. The results obtained from the BCO are compared to those achieved from the conventional approaches i.e., Genetic Algorithm (GA) and Tabu Search (TS) algorithm. Conclusion/Recommendations: The experimental results showed that the BCO approach can quickly generate efficient and flexible solutions to dispatch RMC trucks. Furthermore, the obtained results had higher quality solution efficiently and faster computational time than those obtained from the conventional approaches.

Licence and reuse

Free to read. This article carries the publisher’s copyright, as printed on it: © 2010 Science Publications. It is free to read; ask us before reusing it.

How to reuse this article

Responses (0)

Have a comment on this research? Sign in to respond. Responses are moderated and published with your name and affiliation; the authors are invited to reply. How we use your dataWrite a response

About this article

Cite this article

Srichandum, S. & Rujirayanyong, T. (2010). Production Scheduling for Dispatching Ready Mixed Concrete Trucks Using Bee Colony Optimization. American Journal of Engineering and Applied Sciences, 3(1), 7–14. https://doi.org/10.3844/ajeassp.2010.7.14

Licence
© Science Publications
Issue
Volume 3, Issue 1
Policies
Editorial independenceUse of generative AIData availabilityAppeals and complaints
Version
Version of record
Production Scheduling for Dispatching Ready Mixed Concrete Trucks Using Bee Colony OptimizationAmerican Journal of Engineering and Applied Sciences · Volume 3, Issue 1 · pp. 7–14 · © Science PublicationsDownload