Applying a Just-in-Time Integrated Supply Chain Model with Inventory and Waste Reduction Considerations
Li-Hsing Ho1 & Wei-Feng Kao2 Show affiliations
- Department of Technology Management, Taiwan
- Ph.D. Program of Technology Management, Chung Hua University, 707, Sec.2, WuFu Rd., Hsinchu, 30012, R.O.C, Taiwan
American Journal of Applied Sciences, Volume 10, Issue 7, pp. 751–759 · doi.org/10.3844/ajassp.2013.751.759
Abstract
Just-In-Time (JIT) has been playing an important role in supply chain environments. Countless firms have been applying JIT in production to gain and maintain a competitive advantage. This study introduces an innovative model which integrates inventory and quality assurance in a JIT supply chain. This approach assumes that manufacturing will produce some defective items and those products will not influence the buyer’s purchase policy. The vendor absorbs all the inspection costs. Using a function to compute the expected amount of total cost every year will minimize the total cost and the nonconforming fraction. Finally, a numerical example further confirms this model.
Licence and reuse
Open access. This article is licensed under a Creative Commons Attribution 3.0 Licence (CC BY 3.0), as printed on the article, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original authors and the source. No permission is needed.
How to reuse this articleResponses (0)
About this article
Ho, L. & Kao, W. (2013). Applying a Just-in-Time Integrated Supply Chain Model with Inventory and Waste Reduction Considerations. American Journal of Applied Sciences, 10(7), 751–759. https://doi.org/10.3844/ajassp.2013.751.759
- Licence
- CC BY 3.0
- Issue
- Volume 10, Issue 7
- Policies
- Editorial independenceUse of generative AIData availabilityAppeals and complaints
- Version
- Version of record
