Investigation of the Critical Clearing Time of Power System with Synchronous Machine Model Including Saliency
Prechanon Kumkratug1 Show affiliations
- Division of Electrical Engineering, Faculty of Engineering at Si Racha, Kasetsart University, 199 M.6, Tungsukhla, Si Racha, Chonburi, 20230, Thailand
American Journal of Applied Sciences, Volume 9, Issue 2, pp. 227–230 · doi.org/10.3844/ajassp.2012.227.230
Abstract
Problem statement: Most of synchronous generator applied in power system is the salient pole type. Most of previous researches use non-salient model to evaluate the critical clearing time. Thus the results of critical clearing time of power system may be error. Approach: Thus this paper investigate the critical clearing time of power system with synchronous machine. The mathematical model of non-salient pole and salient pole synchronous machine model in power system are symmetrically derived. The critical clearing time of both models are tested and compared on various cases. Results: The critical clearing time of the power system with synchronous including saliency is slightly higher that of non saliency model. Conclusion: It is found from simulation results that even swing curve of both models is obviously different. Their critical clearing times are slightly different.
Licence and reuse
Free to read. This article carries the publisher’s copyright, as printed on it: © 2012 Science Publications. It is free to read; ask us before reusing it.
How to reuse this articleResponses (0)
About this article
Kumkratug, P. (2012). Investigation of the Critical Clearing Time of Power System with Synchronous Machine Model Including Saliency. American Journal of Applied Sciences, 9(2), 227–230. https://doi.org/10.3844/ajassp.2012.227.230
- Licence
- © Science Publications
- Issue
- Volume 9, Issue 2
- Policies
- Editorial independenceUse of generative AIData availabilityAppeals and complaints
- Version
- Version of record
