The Economic Feasibility of Rebuilding Al-Isra University Tunnel — Mechanical Factors
Bassam Al-Helou
American Journal of Applied Sciences, Volume 3, Issue 4, pp. 1785–1789 · doi.org/10.3844/ajassp.2006.1785.1789
Abstract
Economic feasibility is the cornerstone in the decision making on an economic venture. The more positive the economic signs, the less the risk and foreseen losses. This study throws light on some economic advantages of rebuilding Al-Isra tunnel, especially in terms of shortening the car/bus trip by six kilometers go and fro, and in terms of reducing the trip schedule by five minutes. That is by using an alternative road through one of the present tunnels available on the way to the university. The study makes also a comparison between the construction cost and the emanating benefits in terms of saving time and vehicle operation. The sensitivity analysis shows that the B/C ratio is 3.05, and in worst cases it is 2.03. While these results definitely prove the economic feasibility of the project, they also point to the risk reduction of traffic accidents, due to road shortening.
Licence and reuse
Free to read. This article carries the publisher’s copyright, as printed on it: © 2006 Science Publications. It is free to read; ask us before reusing it.
How to reuse this articleResponses (0)
About this article
Al-Helou, B. (2006). The Economic Feasibility of Rebuilding Al-Isra University Tunnel — Mechanical Factors. American Journal of Applied Sciences, 3(4), 1785–1789. https://doi.org/10.3844/ajassp.2006.1785.1789
- Licence
- © Science Publications
- Issue
- Volume 3, Issue 4
- Policies
- Editorial independenceUse of generative AIData availabilityAppeals and complaints
- Version
- Version of record
